Biobox Standard 20+
- Capacity: 4 m³ / 24hrs
- Permanent residents: 20
At a newly built hotel complex, we installed a bio-treatment plant with a capacity of 30 m³/24h. After screening and obtaining the necessary permits, the treated technical water is discharged into the river following filtration.