...
8 მომხმარებელი

CONSTRUCTION GROUP LTD - Abastumani

A new school was built without a sewage system. We installed two bio-treatment plants with a capacity of 1.6 m³ each – Standard 8.

Equipment used in the project

Biobox Eco 8

Biobox Eco 8

  • Capacity: 1,6 m³ / 24hrs
  • Permanent residents: 8

Gallery

Other works

Request Call