GEO / ENG

LTD "Powderproject.ge" - Bakhmaro

About the project

The largest hotel in Bakuriani was equipped with a 6 m³ bio-treatment system, capable of handling high-load conditions.

Equipment used in the project

Biobox Premium 20+

Biobox Premium 20+

  • Capacity: 4 m³ / 24hrs
  • Permanent residents: 20

Gallery